STELLAR ENERGY IN ACTION
Correos Express expands its service in the central area of Madrid with the opening of this new branch in Getafe.
This new platform cover a surface area of some 10,000 m2, has 2 sorters, 40 trailer docks and 54 light docks, and is equipped with the latest technology to provide logistics services. It includes sorting systems with dynamic weighing and mechanical conveyor and has a production capacity of 12,000 packs/hour.
The main requirement was to cover a power demand of 450 kVA, which would be automatically activated in the event of a power failure. Other requirements associated with this project were the following: