STELLAR ENERGY IN ACTION
The Liceo Europeo de Madrid is a private school of national and international prestige.
More than 1,200 students between the ages of 2 and 18 attend the school. Its extensive facilities and unique equipment required the installation of emergency equipment to ensure an uninterrupted power supply.
Installation locationMadrid (Spain)
Generator power, Generator power1 x 700 kVA
Installed generators setsTrade reference: 1 x BGVS 700 ST
This leading educational centre required the installation of a generator set to ensure the continuity of its installations, with silence as the focus.
Components of the highest quality and reliability as well as a rapid response to mains failures, were the essential requirements of this project. These requirements were supplemented by the following: