Cabecera Desktop 1920x610

1,250 kVA of power to guarantee the electricity supply at the Green Logistics Park in Azambuja

By the end of 2023, Portugal will have a new logistics park of more than 112,000 square metres, a unique logistics plant that stands out for being designed following strict standards of energy efficiency and sustainability in the supply chain and construction in order to reduce CO2 emissions.

The Rainha Green Logistics Park is located in Azambuja, a strategic and privileged location for Big Box logistics, where renown national and international companies will converge.

In order to guarantee an ongoing and uninterrupted power supply, a 1,250 kVA generator set has been installed in the first completed building of this green logistics platform.

Dagartech completes a new project with the installation of a 1,250kVA generator set to guarantee the power supply of the first completed building in this unique logistics park.

Big 1050x500
small - 700x500_

Project requirements

  • The energy needs of the installation were sized at 1,250 kVA stand-by.
  • The main requirement of this project was to guarantee the operational availability of the installation, exceeding 24 hours of autonomy at 100% charge in the event of grid failures.
  • Flexible and comprehensive event monitoring and comprehensive display of engine-related information, thus facilitating maintenance or fault detection.
Close ✕

Filtro categoria

Fuel

Frequency

  • (301)
  • (144)

Voltage

  • (36)
  • (36)
  • (45)
  • (35)
  • (256)
  • (37)

Version

  • (220)
  • (225)

Engine

  • (97)
  • (27)
  • (3)
  • (4)
  • (39)
  • (8)
  • (8)
  • (136)
  • (1)
  • (121)
  • (1)

Power

  • (9)
  • (34)
  • (120)
  • (131)
  • (36)
  • (83)
  • (32)

Filtros seleccionados

Barra de busqueda